204.284.3366   info@nscons.ca

Home »

Bipole III Transmission Project

The Bipole III Transmission Project is a 1450 km long, 500 kV high voltage direct current (HVDC) transmission line that extends from a converter station near the town of Gillam, Manitoba to its terminus east of Winnipeg, Manitoba. The project will enhance the reliability and increase the capacity of Manitoba Hydro's transmission system that delivers hydroelectric power to southern Manitoba and the United States. The estimated completion date is 2018.

NSC's role in the project:

About  |   Careers  |   Contact
North/South Consultants Inc. · 83 Scurfield Blvd. · Winnipeg, MB · R3Y 1G4