204.284.3366   info@nscons.ca

Alexander Generating Station – Lake Sturgeon Mitigation and Effectiveness Monitoring

Client: Ontario Power Generation
Location: Nipigon River, Ontario
Date: 2014-2018

Services Provided by NSC:

Home »

Alexander Generating Station – Lake Sturgeon Mitigation and Effectiveness Monitoring

NSC was contracted by the Association of Irrigators in Manitoba to conduct a field validation of proposed minimum instream flows in several streams undergoing water withdrawals for irrigation. A total of 17 sites on 14 streams were visited during high, moderate and low flows to assess physical and biological conditions. Flows were then compared to mean annual flows and, where possible, a minimum instream flow was recommended for each watercourse.

NSC's role in the project:

About  |   Careers  |   Contact
North/South Consultants Inc. · 83 Scurfield Blvd. · Winnipeg, MB · R3Y 1G4