204.284.3366   info@nscons.ca

Pointe du Bois Generating Station - Spawning Shoal Construction

Client: Manitoba Hydro
Location: Pointe du Bois on the Winnipeg River, Manitoba
Date: 2009-2012

Services Provided by NSC:

Home »

Pointe du Bois Generating Station - Spawning Shoal Construction

Manitoba Hydro undertook a study to determine the feasibility and utility of constructing rock shoals in a hydroelectric powerhouse tailrace to enhance Lake Sturgeon spawning conditions. Four shoals were constructed over a two-year period. The shoals were placed at varying distances from the powerhouse at different locations in relation to turbine flows.

NSC's role in the project:

About  |   Careers  |   Contact
North/South Consultants Inc. · 83 Scurfield Blvd. · Winnipeg, MB · R3Y 1G4