Pointe du Bois Spillway Replacement - Environmental Assessment and Licensing
Client: | Manitoba Hydro |
Location: | Pointe du Bois on the Winnipeg River, Manitoba |
Date: | 2006-2011 |
Services Provided by NSC:
Home »
Manitoba Hydro undertook a project to replace the existing spillway and sluiceway at the Pointe du Bois Generating Station with a new 7-bay spillway. The project was initiated to maintain public and dam safety and provide a safer working environment for site staff. NSC led the aquatic component of the Environmental Impact Assessment process. Baseline studies began in 2006 and were completed in 2010. Protecting Lake Sturgeon was of particular importance given that a population spawned below the dam.
NSC's role in the project: